This was not twinned in 1970 but in fact tripled from the start. Studio 4 was then added by utilising the old restaurant space just off the circle foyer. It was the fastest conversion at the time with only 21 days elapsing from the Plaza closing to the Studios 1-2-3 opening. The building was demolished in 2012.
This was not twinned in 1970 but in fact tripled from the start. Studio 4 was then added by utilising the old restaurant space just off the circle foyer. It was the fastest conversion at the time with only 21 days elapsing from the Plaza closing to the Studios 1-2-3 opening. The building was demolished in 2012.