Odeon Leicester Square – 2018 Refurbishment – Ground Floor Foyer.
Odeon Leicester Square – 2018 Refurbishment – Ground Floor Foyer.
The sub-floor, left as exposed screed on opening in December 2018, has now been covered with what is presumably an epoxy resin-based system.
Alas, marks and deposited dirt are highly visible, and it must be assumed that short of perpetual cleaning, it will be impossible to keep it looking pristine at all times.
In front of each of the two main sets doors from Leicester Square, the floor is inset (?) with text reading:
“FIRST, FOREMOST, AND FOREVER
"—OSCAR DEUTSCH.”
Taken February 2019.
No one has favorited this photo yet